Woluoqiao Hydropower Station is located in Yanyuan County, Liangshan Prefecture, Sichuan Province.
It is the first cascade diversion conduit type power Station on the middle reaches of Woluo River, a secondary tributary of Yalong River.
The power Station is in the dam and diversion conduit type development with the design water head of 90 m, the designer flow of 126.93m³ /s, and the installed capacity of 100 MW.
Theproject was started in June 2007 and completed in December 2011.The dam of the Woluoqiao Hydropower Station is a gravelly soil core-wall rockfill dam with filling volume of 1 million cubic meters.